Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
97
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0724 # 03 Y:2019 | 03 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $49,629 | $100,000 | Not Implemented |
OR0724 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $10,104 | $18,004 | Not Implemented |
OR0724 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,124 | $3,891 | Not Implemented |
OR0724 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,637 | $3,836 | Not Implemented |
WM0141 # 09 Y:2019 | 09 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $758 | $1,755 | Implemented |
AS0478 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,567 | $2,918 | Implemented |
AS0478 # 04 Y:2019 | 04 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,543 | $27,245 | Not Implemented |
AS0478 # 01 Y:2019 | 01 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $25,716 | $2,242 | Implemented |
AS0478 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,212 | $45,350 | Not Implemented |
AS0478 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,813 | $447 | Not Implemented |
SF0544 # 05 Y:2019 | 05 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $249,622 | $1,187,556 | Implemented |
SF0544 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,820 | $9,188 | Implemented |
SF0544 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $920 | $0 | Implemented |
SF0544 # 02 Y:2019 | 02 | 2019 | MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS | $1,610 | $2,208 | Implemented |
SF0544 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,026 | $11,278 | Not Implemented |
NL0038 # 04 Y:2019 | 04 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,391 | $31,162 | Not Implemented |
NL0038 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,806 | $4,500 | Not Implemented |
NL0038 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,352 | $25,229 | Not Implemented |
NL0038 # 01 Y:2019 | 01 | 2019 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $16,358 | $20,000 | Not Implemented |
IC0219 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,919 | $737 | Not Implemented |
IC0219 # 02 Y:2019 | 02 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $30,480 | $17,728 | Not Implemented |
IC0219 # 01 Y:2019 | 01 | 2019 | REPLACE BOILER | $68,168 | $25,600 | Not Implemented |
GT0927 # 05 Y:2019 | 05 | 2019 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $308,141 | $1,725,000 | Not Implemented |
GT0927 # 01 Y:2019 | 01 | 2019 | INSTALL OCCUPANCY SENSORS | $32,534 | $4,145 | Implemented |
GT0927 # 04 Y:2019 | 04 | 2019 | INSULATE BARE EQUIPMENT | $5,352 | $6,398 | Implemented |