Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 3273 Cement and Concrete Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0425 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $4,121 $0 Implemented
MI0425 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,229 $1,980 Implemented
UF0582 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $226,296 $102,253 Implemented
UF0582 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,793 $79,204 Implemented
UF0582 # 08 Y:2022 08 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,408 $756 Implemented
UF0582 # 10 Y:2022 10 2022 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $16,853 $7,275 Implemented
UF0582 # 12 Y:2022 12 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $333,010 $0 Implemented
UF0555 # 05 Y:2020 05 2020 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $340,000 $5,859 Implemented
UF0555 # 04 Y:2020 04 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,821 $3,900 Implemented
UF0555 # 01 Y:2020 01 2020 INCREASE EFFICIENCY OF TRUCKS $70,950 $336,000 Implemented
UF0555 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,846 $7,217 Implemented
UF0555 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $2,700 $10,047 Implemented
MI0161 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $295 $24 Implemented
MI0161 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,042 $1,032 Implemented
MI0161 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,779 $720 Implemented
MI0161 # 01 Y:2008 01 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $32,580 $89,078 Implemented
UF0355 # 07 Y:2005 07 2005 RECYCLE FLUORESCENT LAMPS $625 $3,496 Implemented
UF0355 # 06 Y:2005 06 2005 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $12,491 $50,000 Implemented
UF0355 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,000 $23,755 Implemented
UF0355 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,438 $478 Implemented
UF0355 # 02 Y:2005 02 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $21,072 $93,200 Implemented
UF0355 # 01 Y:2005 01 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,486 $80,890 Implemented