Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
178
matching recommendationsNAICS | 3274 | Lime and Gypsum Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0603 # 10 Y:2020 | 10 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $474 | $1,450 | Not Implemented |
AS0459 # 01 Y:2018 | 01 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $23,170 | $22,956 | Not Implemented |
AS0459 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,314 | $280 | Implemented |
AS0459 # 03 Y:2018 | 03 | 2018 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,682 | $13,900 | Not Implemented |
AS0459 # 04 Y:2018 | 04 | 2018 | INSTALL TIMERS AND/OR THERMOSTATS | $1,642 | $3,200 | Implemented |
AS0459 # 05 Y:2018 | 05 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $881 | $350 | Not Implemented |
UU0133 # 01 Y:2018 | 01 | 2018 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $473,255 | $175,000 | Not Implemented |
UU0133 # 02 Y:2018 | 02 | 2018 | USE POWER DURING OFF-PEAK PERIODS | $206,416 | $1,600 | Not Implemented |
UU0133 # 03 Y:2018 | 03 | 2018 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $30,169 | $97,680 | Not Implemented |
UU0133 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,825 | $0 | Not Implemented |
UU0133 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,767 | $5,679 | Implemented |
UU0133 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $2,849 | $1,155 | Implemented |
GT0898 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,203 | $150 | Not Implemented |
GT0898 # 02 Y:2017 | 02 | 2017 | METER WASTE WATER | $38,607 | $18,000 | Implemented |
GT0898 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,648 | $9,390 | Implemented |
GT0898 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,223 | $8,011 | Not Implemented |
GT0898 # 05 Y:2017 | 05 | 2017 | USE SOLAR HEAT FOR HEAT | $42,901 | $150,153 | Not Implemented |
AM0713 # 01 Y:2016 | 01 | 2016 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $453,910 | $3,100,000 | Not Implemented |
AM0713 # 02 Y:2016 | 02 | 2016 | OPTIMIZE PLANT POWER FACTOR | $58,650 | $76,000 | Implemented |
AM0713 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,870 | $16,220 | Implemented |
AM0713 # 04 Y:2016 | 04 | 2016 | USE SYNTHETIC LUBRICANT | $4,600 | $0 | Implemented |
AM0713 # 05 Y:2016 | 05 | 2016 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,460 | $3,900 | Implemented |
AM0664 # 01 Y:2014 | 01 | 2014 | OPTIMIZE PLANT POWER FACTOR | $46,500 | $51,870 | Not Implemented |
AM0664 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,030 | $3,600 | Implemented |
AM0664 # 03 Y:2014 | 03 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,750 | $12 | Not Implemented |