IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

208

matching recommendations
Reset
NAICS 3279 Other Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0544 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,820 $9,188 Implemented
GT0927 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $5,352 $6,398 Implemented
GT0927 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,382 $27,983 Implemented
GT0927 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,930 $2,500 Implemented
GT0927 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $32,534 $4,145 Implemented
GT0922 # 05 Y:2019 05 2019 PAY BILLS ON TIME TO AVOID LATE FEES $281 $1,190 Implemented
GT0922 # 01 Y:2019 01 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $8,082 $1,200 Implemented
GT0922 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $76,284 $79,761 Implemented
GT0922 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,604 $3,500 Implemented
GT0922 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $6,827 $1,175 Implemented
SU0463 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,966 $4,800 Implemented
UU0134 # 05 Y:2018 05 2018 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,549 $0 Implemented
NC0609 # 06 Y:2018 06 2018 DEVELOP A REPAIR/REPLACE POLICY $1,705 $5,685 Implemented
NC0609 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,341 $2,500 Implemented
NC0609 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $650 $200 Implemented
NC0609 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,593 $8,972 Implemented
WV0554 # 08 Y:2018 08 2018 DEVELOP A REPAIR/REPLACE POLICY $1,406 $632 Implemented
WV0554 # 06 Y:2018 06 2018 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $6,147 $21,264 Implemented
WV0554 # 09 Y:2018 09 2018 MINIMIZE WATER USAGE $1,354 $700 Implemented
WV0554 # 12 Y:2018 12 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $221 $516 Implemented
WV0554 # 05 Y:2018 05 2018 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,868 $1,000 Implemented
WV0554 # 11 Y:2018 11 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $424 $133 Implemented
WV0554 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,081 $5,593 Implemented
WV0554 # 02 Y:2018 02 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,639 $30,000 Implemented
TR0007 # 08 Y:2018 08 2018 INSULATE BARE EQUIPMENT $421 $38 Implemented