IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,892

matching recommendations
Reset
NAICS 331 Primary Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0254 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $18,943 $4,090 Implemented
BD0315 # 05 Y:2006 05 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,369 $750 Implemented
BD0315 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $382 $379 Implemented
UU0102 # 01 Y:2006 01 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $88,420 $3,500 Implemented
UU0102 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,430 $4,040 Implemented
UU0102 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $23,250 $8,290 Implemented
LL0250 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $40,871 $5,998 Implemented
LL0250 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $37,521 $5,040 Implemented
MA0604 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $20,912 $14,335 Implemented
MA0604 # 04 Y:2006 04 2006 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $8,539 $8,050 Implemented
MA0604 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,206 $13,536 Implemented
OK0730 # 02 Y:2006 02 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,500 $1,237 Implemented
OK0730 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,533 $3,500 Implemented
OK0730 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150 $767 Implemented
OK0730 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,886 $1,767 Implemented
LM0118 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,104 $425 Implemented
LE0235 # 02 Y:2006 02 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $202,503 $95,000 Implemented
LE0235 # 03 Y:2006 03 2006 UPGRADE OBSOLETE EQUIPMENT $192,971 $250,000 Implemented
LE0235 # 05 Y:2006 05 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $66,844 $100 Implemented
LE0235 # 06 Y:2006 06 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $63,349 $20,000 Implemented
LE0235 # 07 Y:2006 07 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $22,786 $30,000 Implemented
LE0235 # 09 Y:2006 09 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,444 $6,000 Implemented
LE0235 # 11 Y:2006 11 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $9,908 $7,500 Implemented
LE0235 # 12 Y:2006 12 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,006 $1,000 Implemented
LL0251 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $19,891 $2,392 Implemented