IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

204

matching recommendations
Reset
NAICS 3311 Iron and Steel Mills and Ferroalloy Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0743 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,749 $1,426 Not Implemented
MA0743 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $406 $980 Not Implemented
MA0743 # 05 Y:2015 05 2015 UPGRADE CONTROLS ON COMPRESSORS $373 $500 Not Implemented
MA0743 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $340 $300 Not Implemented
OR0643 # 03 Y:2015 03 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $216,797 $596,000 Not Implemented
OR0643 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,403 $46,360 Implemented
OR0643 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,697 $0 Implemented
UA0107 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,548 $48 Not Implemented
UA0107 # 02 Y:2013 02 2013 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $38,831 $7,430 Not Implemented
UA0107 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,182 $17,526 Not Implemented
UA0106 # 04 Y:2013 04 2013 USE OPTIMUM THICKNESS INSULATION $17,964 $9,249 Not Implemented
UA0106 # 03 Y:2013 03 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $51,514 $100,000 Not Implemented
UA0106 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $58,770 $91,630 Not Implemented
UA0106 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $28,561 $600 Not Implemented
WV0470 # 10 Y:2013 10 2013 DEVELOP A REPAIR/REPLACE POLICY $152 $380 Not Implemented
WV0470 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $105 Implemented
WV0470 # 01 Y:2013 01 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $24,095 $2,500 Implemented
WV0470 # 02 Y:2013 02 2013 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $16,582 $68,000 Implemented
WV0470 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,807 $20,200 Not Implemented
WV0470 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $4,666 $1,080 Implemented
WV0470 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,422 $13,020 Not Implemented
WV0470 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,069 $2,050 Implemented
WV0470 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,892 $3,300 Not Implemented
WV0470 # 07 Y:2013 07 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,736 $1,700 Implemented
OR0598 # 02 Y:2012 02 2012 UPGRADE CONTROLS ON COMPRESSORS $2,289 $1,015 Not Implemented