Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
999
matching recommendationsNAICS | 3312 | Steel Product Manufacturing from Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0308 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,560 | $110 | Implemented |
WV0308 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,364 | $3,520 | Implemented |
WV0308 # 03 Y:2005 | 03 | 2005 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,526 | $714 | Implemented |
WV0308 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,098 | $382 | Not Implemented |
WV0308 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,298 | $0 | Not Implemented |
WV0308 # 06 Y:2005 | 06 | 2005 | USE SYNTHETIC LUBRICANT | $2,037 | $124 | Implemented |
WV0308 # 07 Y:2005 | 07 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $1,350 | $72 | Implemented |
WV0308 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,329 | $0 | Implemented |
WV0308 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,156 | $4,132 | Implemented |
WV0308 # 10 Y:2005 | 10 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $835 | $180 | Not Implemented |
WV0308 # 11 Y:2005 | 11 | 2005 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $99,840 | $150,768 | Not Implemented |
IC0094 # 01 Y:2005 | 01 | 2005 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $28,301 | $54,519 | Not Implemented |
IC0094 # 02 Y:2005 | 02 | 2005 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,962 | $6,778 | Not Implemented |
IC0094 # 03 Y:2005 | 03 | 2005 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $24,437 | $32,056 | Implemented |
IC0094 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,623 | $3,900 | Implemented |
IC0094 # 05 Y:2005 | 05 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $992 | $890 | Not Implemented |
IC0094 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,200 | $0 | Not Implemented |
IC0094 # 07 Y:2005 | 07 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,655 | $2,640 | Not Implemented |
IC0094 # 08 Y:2005 | 08 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,394 | $5,123 | Not Implemented |
LE0207 # 01 Y:2005 | 01 | 2005 | REPLACE BOILER | $109,438 | $9,760 | Implemented |
LE0207 # 02 Y:2005 | 02 | 2005 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $72,942 | $500 | Not Implemented |
LE0207 # 03 Y:2005 | 03 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $21,328 | $8,300 | Implemented |
LE0207 # 04 Y:2005 | 04 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $5,300 | $4,500 | Not Implemented |
LE0207 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,115 | $1,000 | Implemented |
LE0207 # 06 Y:2005 | 06 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $1,341 | $500 | Implemented |