Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
268
matching recommendationsNAICS | 33122 | Rolling and Drawing of Purchased Steel |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0722 # 04 Y:2005 | 04 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $2,776 | $1,448 | Implemented |
UD0722 # 05 Y:2005 | 05 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,734 | $9,650 | Implemented |
UD0722 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $104 | $102 | Implemented |
WV0308 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,560 | $110 | Implemented |
WV0308 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,364 | $3,520 | Implemented |
WV0308 # 03 Y:2005 | 03 | 2005 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,526 | $714 | Implemented |
WV0308 # 06 Y:2005 | 06 | 2005 | USE SYNTHETIC LUBRICANT | $2,037 | $124 | Implemented |
WV0308 # 07 Y:2005 | 07 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $1,350 | $72 | Implemented |
WV0308 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,329 | $0 | Implemented |
WV0308 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,156 | $4,132 | Implemented |
UD0711 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,813 | $2,025 | Implemented |
UD0711 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,651 | $1,240 | Implemented |
UD0711 # 08 Y:2005 | 08 | 2005 | INSULATE BARE EQUIPMENT | $1,305 | $3,530 | Implemented |
UD0702 # 03 Y:2004 | 03 | 2004 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $25,611 | $10,795 | Implemented |
UD0702 # 07 Y:2004 | 07 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $3,625 | $0 | Implemented |
UD0702 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,961 | $92 | Implemented |
UD0702 # 10 Y:2004 | 10 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $892 | $114 | Implemented |
LE0194 # 01 Y:2004 | 01 | 2004 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $866,040 | $200,000 | Implemented |
LE0194 # 02 Y:2004 | 02 | 2004 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $59,658 | $12,500 | Implemented |
LE0194 # 06 Y:2004 | 06 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,196 | $4,000 | Implemented |
LE0194 # 07 Y:2004 | 07 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,787 | $750 | Implemented |
UD0700 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,353 | $82,536 | Implemented |
UD0700 # 16 Y:2004 | 16 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $588 | $500 | Implemented |
UD0699 # 03 Y:2004 | 03 | 2004 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $297,217 | $0 | Implemented |
UD0699 # 05 Y:2004 | 05 | 2004 | DISCONNECT BALLASTS | $7,031 | $377 | Implemented |