IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
Reset
NAICS 331222 Steel Wire Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0120 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,943 $1,300 Implemented
IC0120 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $447 $911 Implemented
IC0120 # 07 Y:2006 07 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,533 $18,187 Implemented
IC0120 # 09 Y:2006 09 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $114,144 $385,200 Implemented
IC0120 # 11 Y:2006 11 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $71,667 $6,720 Implemented
WV0308 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,560 $110 Implemented
WV0308 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,364 $3,520 Implemented
WV0308 # 03 Y:2005 03 2005 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,526 $714 Implemented
WV0308 # 06 Y:2005 06 2005 USE SYNTHETIC LUBRICANT $2,037 $124 Implemented
WV0308 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $1,350 $72 Implemented
WV0308 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,329 $0 Implemented
WV0308 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,156 $4,132 Implemented
UD0702 # 03 Y:2004 03 2004 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $25,611 $10,795 Implemented
UD0702 # 07 Y:2004 07 2004 UPGRADE CONTROLS ON COMPRESSORS $3,625 $0 Implemented
UD0702 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,961 $92 Implemented
UD0702 # 10 Y:2004 10 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $892 $114 Implemented
LE0194 # 01 Y:2004 01 2004 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $866,040 $200,000 Implemented
LE0194 # 02 Y:2004 02 2004 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $59,658 $12,500 Implemented
LE0194 # 06 Y:2004 06 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,196 $4,000 Implemented
LE0194 # 07 Y:2004 07 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,787 $750 Implemented
UD0700 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,353 $82,536 Implemented
UD0700 # 16 Y:2004 16 2004 UPGRADE CONTROLS ON COMPRESSORS $588 $500 Implemented
UD0699 # 03 Y:2004 03 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $297,217 $0 Implemented
UD0699 # 05 Y:2004 05 2004 DISCONNECT BALLASTS $7,031 $377 Implemented
UD0699 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,689 $0 Implemented