IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

243

matching recommendations
Reset
NAICS 3314 Nonferrous Metal (except Aluminum) Production and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0356 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,905 $5,175 Implemented
LE0356 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,126 $3,215 Implemented
LE0356 # 05 Y:2013 05 2013 ADJUST BURNERS FOR EFFICIENT OPERATION $756 $0 Implemented
LE0356 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,341 $0 Implemented
LE0356 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,399 $3,700 Implemented
LE0356 # 12 Y:2013 12 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,638 $1,086 Implemented
MZ0107 # 02 Y:2013 02 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $43,709 $1,000 Implemented
MZ0107 # 04 Y:2013 04 2013 USE OPTIMUM THICKNESS INSULATION $6,130 $1,825 Implemented
MZ0107 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $4,907 $3,080 Implemented
MZ0107 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,600 $1,745 Implemented
MZ0107 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,356 $710 Implemented
MZ0107 # 09 Y:2013 09 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,541 $1,810 Implemented
MZ0107 # 10 Y:2013 10 2013 USE OPTIMUM THICKNESS INSULATION $1,288 $1,499 Implemented
MZ0107 # 11 Y:2013 11 2013 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $845 $1,115 Implemented
MZ0107 # 12 Y:2013 12 2013 USE PHOTOCELL CONTROLS $265 $320 Implemented
AM0622 # 03 Y:2012 03 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $25,450 $69,300 Implemented
AM0622 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,720 $520 Implemented
AM0622 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,780 $870 Implemented
AM0622 # 09 Y:2012 09 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $560 $0 Implemented
LE0349 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,018 $7,190 Implemented
LE0349 # 02 Y:2012 02 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $85,383 $310,000 Implemented
LE0349 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,373 $1,080 Implemented
LE0349 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,052 $200 Implemented
OK0834 # 01 Y:2012 01 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,800 $0 Implemented
OK0834 # 04 Y:2012 04 2012 KEEP BOILER TUBES CLEAN $810 $500 Implemented