Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
253
matching recommendationsNAICS | 3314 | Nonferrous Metal (except Aluminum) Production and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0341 # 04 Y:2007 | 04 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,392 | $919 | Implemented |
SF0341 # 06 Y:2007 | 06 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,960 | $9,373 | Implemented |
SF0341 # 07 Y:2007 | 07 | 2007 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $20,686 | $15,000 | Implemented |
SF0341 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,585 | $1,620 | Implemented |
SF0341 # 09 Y:2007 | 09 | 2007 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $51,342 | $60,000 | Implemented |
SF0341 # 11 Y:2007 | 11 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,983 | $19,920 | Implemented |
SF0341 # 13 Y:2007 | 13 | 2007 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $17,456 | $0 | Implemented |
NC0358 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $308 | $100 | Implemented |
NC0358 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $327 | $316 | Implemented |
MS0294 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,760 | $172 | Implemented |
MS0294 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,240 | $609 | Implemented |
UD0721 # 01 Y:2005 | 01 | 2005 | RECOVER MECHANICAL ENERGY | $206,969 | $413,938 | Implemented |
UD0721 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,010 | $86,100 | Implemented |
UD0721 # 03 Y:2005 | 03 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $11,745 | $160 | Implemented |
UD0721 # 04 Y:2005 | 04 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,579 | $12,000 | Implemented |
UD0721 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,580 | $0 | Implemented |
UD0721 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,040 | $11,100 | Implemented |
MA0574 # 01 Y:2005 | 01 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $179,823 | $140,865 | Implemented |
MA0574 # 02 Y:2005 | 02 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $140,952 | $230,000 | Implemented |
MA0574 # 05 Y:2005 | 05 | 2005 | INSULATE BARE EQUIPMENT | $3,466 | $1,801 | Implemented |
MA0574 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $2,911 | $5,770 | Implemented |
MA0574 # 07 Y:2005 | 07 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $960 | $0 | Implemented |
UF0359 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $627 | $0 | Implemented |
UF0359 # 04 Y:2005 | 04 | 2005 | USE PHOTOCELL CONTROLS | $448 | $0 | Implemented |
UF0359 # 05 Y:2005 | 05 | 2005 | CHANGE OPERATING CONDITIONS | $15,046 | $0 | Implemented |