Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
594
matching recommendationsNAICS | 3314 | Nonferrous Metal (except Aluminum) Production and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0644 # 03 Y:2015 | 03 | 2015 | ELIMINATE/REDUCE AN OPERATION | $106,634 | $72,750 | Implemented |
OR0644 # 04 Y:2015 | 04 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $37,274 | $20,400 | Implemented |
OR0644 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,431 | $1,600 | Not Implemented |
OR0644 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,865 | $3,865 | Implemented |
SF0460 # 01 Y:2015 | 01 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,832 | $0 | Not Implemented |
SF0460 # 02 Y:2015 | 02 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $5,167 | $624 | Implemented |
SF0460 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,080 | $4,429 | Not Implemented |
SF0460 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,945 | $2,541 | Not Implemented |
SF0460 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,462 | $9,228 | Implemented |
SF0460 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,269 | $9,057 | Not Implemented |
SF0460 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,924 | $9,629 | Not Implemented |
SF0460 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,062 | $3,703 | Implemented |
SU0377 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $854 | $514 | Implemented |
SU0377 # 02 Y:2015 | 02 | 2015 | RECOVER AND REUSE WASTE MATERIAL | $1,281,641 | $1,000,000 | Not Implemented |
SU0377 # 03 Y:2015 | 03 | 2015 | ELIMINATE/REDUCE AN OPERATION | $4,112 | $3,576 | Implemented |
SU0377 # 04 Y:2015 | 04 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,129 | $998 | Not Implemented |
SU0377 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,883 | $2,400 | Implemented |
SU0377 # 06 Y:2015 | 06 | 2015 | OPTIMIZE PLANT POWER FACTOR | $5,745 | $12,259 | Not Implemented |
SU0377 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,638 | $5,256 | Implemented |
UM0435 # 01 Y:2013 | 01 | 2013 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,450 | $4,500 | Implemented |
UM0435 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,500 | $200 | Not Implemented |
UM0435 # 03 Y:2013 | 03 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $966 | $2,500 | Implemented |
UM0435 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,000 | $3,000 | Implemented |
MZ0121 # 01 Y:2013 | 01 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $16,992 | $0 | Not Implemented |
MZ0121 # 02 Y:2013 | 02 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,550 | $1,370 | Not Implemented |