IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,490

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0788 # 06 Y:2019 06 2019 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $860 $124 Implemented
LS1914 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,599 $164 Implemented
LS1914 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $588 $0 Implemented
LS1914 # 03 Y:2019 03 2019 USE PHOTOCELL CONTROLS $294 $226 Implemented
LS1914 # 04 Y:2019 04 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $164 $90 Implemented
UD1003 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,300 $4,100 Implemented
UD1003 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,211 $0 Implemented
SU0484 # 02 Y:2019 02 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $370 $157 Implemented
SU0484 # 05 Y:2019 05 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $236 $318 Implemented
SU0484 # 06 Y:2019 06 2019 REDUCE VENTILATION AIR $514 $929 Implemented
SU0484 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,516 $4,046 Implemented
SU0484 # 08 Y:2019 08 2019 INSTALL OCCUPANCY SENSORS $69 $30 Implemented
UD1002 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,369 $4,400 Implemented
UD1002 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,379 $1,000 Implemented
UD1002 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,973 $39,240 Implemented
UD1001 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,285 $4,400 Implemented
UD1001 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $705 $1,200 Implemented
UD1001 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,497 $16,508 Implemented
WM0139 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,399 $2,250 Implemented
WV0584 # 03 Y:2019 03 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $44,593 $129,500 Implemented
WV0584 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $18,530 $6,283 Implemented
WV0584 # 06 Y:2019 06 2019 DEVELOP A REPAIR/REPLACE POLICY $7,129 $675 Implemented
WV0584 # 07 Y:2019 07 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,503 $1,000 Implemented
WV0584 # 09 Y:2019 09 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,899 $510 Implemented
WV0584 # 10 Y:2019 10 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,028 $5,443 Implemented