Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0776 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $1,131 $6,802 n/a
OR0776 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $41,797 $5,903 n/a
OR0776 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $3,031 $18,336 n/a
OR0766 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,906 $4,856 Not Implemented
OR0766 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,610 $0 Implemented
OR0766 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,352 $0 Implemented
OR0697 # 02 Y:2018 02 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,460 $45,600 Not Implemented
OR0697 # 01 Y:2018 01 2018 USE MAGNETIC TECHNOLOGY TO TREAT WATER $201,762 $50,000 Implemented
OR0697 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $25,653 $51,599 Implemented
OR0697 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,725 $250 Implemented
OR0697 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,381 $19,381 Not Implemented
OR0692 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,299 $3,670 Not Implemented
OR0692 # 02 Y:2017 02 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,636 $3,060 Not Implemented
OR0692 # 01 Y:2017 01 2017 REDUCE FLUID FLOW RATES $26,801 $7,395 Not Implemented
OR0689 # 02 Y:2017 02 2017 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $18,000 $1,495 Implemented
OR0689 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,595 $5,595 Implemented
OR0689 # 01 Y:2017 01 2017 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $12,509 $19,000 Implemented
OR0689 # 04 Y:2017 04 2017 REDUCE VENTILATION AIR $3,492 $12,558 Not Implemented
OR0677 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $2,064 $658 Implemented
OR0677 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,583 $22,256 Not Implemented
OR0677 # 03 Y:2016 03 2016 REPLACE BOILER $4,164 $17,322 Not Implemented
OR0677 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,207 $944 Not Implemented
OR0677 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $7,372 $5,408 Implemented
OR0677 # 02 Y:2016 02 2016 USE OPTIMUM TEMPERATURE $1,822 $300 Not Implemented
OR0646 # 02 Y:2015 02 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $42,592 $25,071 Not Implemented