Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsNAICS | 3323 | Architectural and Structural Metals Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1068 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,629 | $100 | Implemented |
UD1048 # 03 Y:2022 | 03 | 2022 | DISCONNECT BALLASTS | $1,787 | $0 | Implemented |
UD0945 # 01 Y:2016 | 01 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $5,063 | $8,000 | Implemented |
UD0945 # 03 Y:2016 | 03 | 2016 | REDUCE FLUID FLOW RATES | $7,163 | $0 | Implemented |
UD0945 # 11 Y:2016 | 11 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,976 | $0 | Implemented |
UD0945 # 12 Y:2016 | 12 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $3,983 | $20,370 | Implemented |
UD0945 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $623 | $30 | Implemented |
UD0945 # 02 Y:2016 | 02 | 2016 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $527 | $0 | Implemented |
WV0494 # 02 Y:2014 | 02 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,532 | $51,000 | Implemented |
WV0494 # 08 Y:2014 | 08 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $473 | $438 | Implemented |
WV0494 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $511 | $1,289 | Implemented |
WV0494 # 06 Y:2014 | 06 | 2014 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,149 | $96 | Implemented |
WV0494 # 05 Y:2014 | 05 | 2014 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $1,708 | $6,552 | Implemented |
WV0494 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,724 | $158 | Implemented |
WV0494 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $371 | $1,411 | Implemented |
WV0494 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,592 | $1,010 | Implemented |
UD0855 # 04 Y:2012 | 04 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,089 | $0 | Implemented |
UD0855 # 01 Y:2012 | 01 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $23,100 | $0 | Implemented |
UD0855 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,665 | $1,000 | Implemented |
UD0855 # 06 Y:2012 | 06 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,118 | $0 | Implemented |
UD0855 # 08 Y:2012 | 08 | 2012 | REDUCE VENTILATION AIR | $2,956 | $6,600 | Implemented |
UD0845 # 02 Y:2011 | 02 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $534 | $0 | Implemented |
UD0845 # 03 Y:2011 | 03 | 2011 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,285 | $4,000 | Implemented |
UD0831 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $713 | $10,495 | Implemented |
UD0831 # 07 Y:2011 | 07 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $189 | $240 | Implemented |