IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

225

matching recommendations
Reset
NAICS 332322 Sheet Metal Work Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0745 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,433 $1,224 Implemented
MA0745 # 03 Y:2015 03 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,022 $36,150 Implemented
AM0680 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,460 $23,910 Implemented
AM0680 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,170 $500 Implemented
AM0680 # 03 Y:2015 03 2015 OPTIMIZE PLANT POWER FACTOR $2,800 $5,010 Implemented
AM0680 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,510 $2 Implemented
AM0680 # 05 Y:2015 05 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,460 $500 Implemented
AM0680 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $425 $165 Implemented
AM0680 # 07 Y:2015 07 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $370 $0 Implemented
AM0680 # 08 Y:2015 08 2015 USE SYNTHETIC LUBRICANT $355 $0 Implemented
SD0488 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,362 $2,700 Implemented
SD0488 # 04 Y:2014 04 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,681 $6,350 Implemented
CO0670 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,960 $670 Implemented
CO0670 # 03 Y:2013 03 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,800 $620 Implemented
CO0670 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $1,160 $330 Implemented
CO0670 # 05 Y:2013 05 2013 USE EVAPORATION TO CONCENTRATE MATERIAL $660 $0 Implemented
CO0670 # 06 Y:2013 06 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,080 $500 Implemented
BD0430 # 07 Y:2013 07 2013 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $4,500 $10,000 Implemented
WM0019 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $915 $0 Implemented
WM0019 # 03 Y:2013 03 2013 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,791 $1,350 Implemented
WM0019 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,444 $510 Implemented
CO0659 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,680 $25,960 Implemented
CO0659 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,470 $500 Implemented
CO0659 # 05 Y:2012 05 2012 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,570 $0 Implemented
UD0855 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,100 $0 Implemented