Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
1,038
matching recommendationsNAICS | 3324 | Boiler, Tank, and Shipping Container Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0230 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,781 | $13,282 | Not Implemented |
IC0230 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,524 | $50 | Implemented |
IC0230 # 04 Y:2020 | 04 | 2020 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $15,197 | $0 | Not Implemented |
IC0230 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $212,444 | $108,320 | Implemented |
IC0230 # 06 Y:2020 | 06 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $45,814 | $7,700 | Not Implemented |
UK1915 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,711 | $2,510 | n/a |
UK1915 # 02 Y:2019 | 02 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $7,951 | $17,032 | n/a |
UK1915 # 03 Y:2019 | 03 | 2019 | INSTALL OCCUPANCY SENSORS | $259 | $260 | n/a |
UK1915 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,983 | $21,695 | n/a |
UK1915 # 05 Y:2019 | 05 | 2019 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $53,903 | $10,200 | n/a |
UK1915 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $13,534 | $26,305 | n/a |
UK1915 # 07 Y:2019 | 07 | 2019 | OPTIMIZE PLANT POWER FACTOR | $127,719 | $54,495 | n/a |
NL0033 # 01 Y:2019 | 01 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $39,609 | $71,240 | Implemented |
NL0033 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,635 | $42,417 | Not Implemented |
NL0033 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $919 | $1,000 | Implemented |
NL0033 # 04 Y:2019 | 04 | 2019 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $539 | $100 | Not Implemented |
MZ0262 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,670 | $37,061 | Implemented |
MZ0262 # 02 Y:2019 | 02 | 2019 | INSTALL OCCUPANCY SENSORS | $3,589 | $1,350 | Implemented |
MZ0262 # 03 Y:2019 | 03 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,138 | $1,820 | Not Implemented |
MZ0262 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,400 | $0 | Not Implemented |
MZ0262 # 05 Y:2019 | 05 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $850 | $0 | Not Implemented |
MZ0262 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,156 | $21,621 | Not Implemented |
MZ0262 # 07 Y:2019 | 07 | 2019 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $32,233 | $65,000 | Not Implemented |
MZ0262 # 08 Y:2019 | 08 | 2019 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,104 | $8,000 | Not Implemented |
MZ0256 # 01 Y:2018 | 01 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,331 | $1,160 | Not Implemented |