IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

229

matching recommendations
Reset
NAICS 332439 Other Metal Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0649 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $8,110 $200 Not Implemented
AM0649 # 05 Y:2014 05 2014 USE SYNTHETIC LUBRICANT $3,690 $0 Implemented
AM0649 # 06 Y:2014 06 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $790 $0 Not Implemented
AM0649 # 07 Y:2014 07 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $770 $60 Not Implemented
AM0649 # 08 Y:2014 08 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $650 $0 Implemented
AM0649 # 09 Y:2014 09 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $250 $55 Implemented
AM0649 # 10 Y:2014 10 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $235 $30 Implemented
AM0649 # 01 Y:2014 01 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $112,575 $24,000 Implemented
NC0491 # 01 Y:2013 01 2013 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $13,288 $25,000 Not Implemented
NC0491 # 02 Y:2013 02 2013 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,220 $31,024 Not Implemented
NC0491 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,560 $4,950 Not Implemented
NC0491 # 04 Y:2013 04 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,591 $10,980 Not Implemented
NC0491 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,248 $11,314 Implemented
NC0491 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $576 $100 Implemented
BD0429 # 03 Y:2013 03 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,152 $30 Not Implemented
BD0429 # 06 Y:2013 06 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $354 $440 Not Implemented
BD0429 # 05 Y:2013 05 2013 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $651 $2,300 Not Implemented
BD0429 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $666 $25 Not Implemented
BD0429 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,306 $5,680 Not Implemented
BD0429 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $226 $700 Not Implemented
BD0429 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,975 $200 Implemented
UM0419 # 03 Y:2013 03 2013 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $9,991 $0 Not Implemented
UM0419 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,593 $200 Not Implemented
UM0419 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,967 $4,350 Not Implemented
UM0415 # 03 Y:2012 03 2012 OPTIMIZE PLANT POWER FACTOR $12,081 $20,000 Not Implemented