IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 33261 Spring and Wire Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0852 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $49,000 $68,400 Implemented
AM0852 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $420 $235 Implemented
AM0852 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,480 $1,500 Implemented
AM0852 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,040 $1,835 Implemented
AM0840 # 10 Y:2022 10 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $86 $179 Implemented
AM0840 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $780 $50 Implemented
AM0840 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,290 $1,000 Implemented
AM0840 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,045 $17,675 Implemented
AM0817 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,690 $8,520 Implemented
AM0817 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $340 $10 Implemented
AM0805 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $28,160 $575 Implemented
AM0805 # 10 Y:2020 10 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,210 $31,000 Implemented
AM0805 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,400 $3,000 Implemented
AM0805 # 03 Y:2020 03 2020 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $505 $0 Implemented
AM0805 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $2,130 $200 Implemented
AM0805 # 06 Y:2020 06 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $140 $15 Implemented
AM0805 # 07 Y:2020 07 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,150 $370 Implemented
AM0805 # 09 Y:2020 09 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,070 $820 Implemented
AM0650 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $540 $550 Implemented
AM0650 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,050 $605 Implemented
AM0650 # 05 Y:2014 05 2014 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,190 $4,080 Implemented
AM0650 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,060 $1,200 Implemented
AM0650 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $31,250 $10,000 Implemented
AM0650 # 01 Y:2014 01 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,640 $0 Implemented
AM0599 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,810 $500 Implemented