IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

594

matching recommendations
Reset
NAICS 33271 Machine Shops
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0070 # 04 Y:2011 04 2011 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,769 $360 Implemented
MZ0070 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $40,140 $10,000 Implemented
MZ0070 # 06 Y:2011 06 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $209 $200 Not Implemented
MZ0070 # 07 Y:2011 07 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $21,157 $16,730 Not Implemented
SU0309 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $201 $0 Implemented
SU0309 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $255 $147 Implemented
SU0309 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $272 $570 Not Implemented
SU0309 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $220 $549 Not Implemented
SU0309 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68 $228 Implemented
SU0309 # 06 Y:2011 06 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $68 $287 Not Implemented
SU0309 # 07 Y:2011 07 2011 UPGRADE OBSOLETE EQUIPMENT $116 $1,258 Implemented
SU0309 # 08 Y:2011 08 2011 UPGRADE OBSOLETE EQUIPMENT $1,442 $16,500 Implemented
AM0598 # 01 Y:2011 01 2011 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $665,600 $1,000,000 Not Implemented
AM0598 # 02 Y:2011 02 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $176,800 $119,000 Implemented
AM0598 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,540 $12,900 Implemented
AM0598 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,800 $1,000 Implemented
AM0598 # 05 Y:2011 05 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,800 $3,800 Implemented
AM0598 # 06 Y:2011 06 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $1,780 $0 Not Implemented
AM0598 # 07 Y:2011 07 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,220 $75 Implemented
AM0598 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $349 $160 Implemented
BD0389 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $4,894 $4,000 Not Implemented
BD0389 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,353 $7,540 Not Implemented
BD0389 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $2,183 $900 Not Implemented
BD0389 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,941 $1,300 Not Implemented
BD0389 # 05 Y:2011 05 2011 USE RADIANT HEATER FOR SPOT HEATING $1,546 $2,400 Not Implemented