IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

188

matching recommendations
Reset
NAICS 33272 Turned Product and Screw, Nut, and Bolt Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0205 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,390 $4,470 Implemented
OK0979 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,331 $1,000 Implemented
DL0154 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,950 $2,280 Implemented
DL0154 # 02 Y:2015 02 2015 USE COMPRESSOR AIR FILTERS $1,390 $2,190 Implemented
DL0154 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,585 $32,700 Implemented
LE0402 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $887 $4,200 Implemented
LE0402 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,975 $9,063 Implemented
LE0402 # 06 Y:2015 06 2015 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $6,037 $22,000 Implemented
LE0402 # 05 Y:2015 05 2015 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,557 $4,800 Implemented
LE0402 # 04 Y:2015 04 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,700 $21,000 Implemented
OK0924 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,037 $21,108 Implemented
OK0924 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,467 $3,653 Implemented
OK0924 # 03 Y:2015 03 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $309 $0 Implemented
OK0924 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,674 $0 Implemented
OK0924 # 04 Y:2015 04 2015 AIR CONDITION ONLY SPACE NECESSARY $408 $1,137 Implemented
UD0918 # 04 Y:2015 04 2015 DEVELOP A REPAIR/REPLACE POLICY $58,864 $75,499 Implemented
UD0918 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,325 $0 Implemented
UD0918 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $3,773 $4,785 Implemented
UD0918 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $537 $1,000 Implemented
UA0120 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,394 $5,695 Implemented
UA0120 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,979 $24,613 Implemented
MZ0138 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $557 $1,075 Implemented
MZ0138 # 05 Y:2014 05 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $358 $0 Implemented
BD0436 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $2,974 $1,500 Implemented
UM0422 # 03 Y:2013 03 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $29,593 $14,120 Implemented