IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

102

matching recommendations
Reset
NAICS 332722 Bolt, Nut, Screw, Rivet, and Washer Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0323 # 01 Y:2007 01 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,469 $3,500 Implemented
UM0323 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $7,978 $1,000 Implemented
UM0323 # 03 Y:2007 03 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,247 $2,653 Implemented
UM0323 # 04 Y:2007 04 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $6,815 $500 Implemented
UM0323 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,347 $8,175 Implemented
UM0323 # 06 Y:2007 06 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,157 $1,836 Implemented
UM0323 # 09 Y:2007 09 2007 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,628 $4,248 Implemented
UM0323 # 10 Y:2007 10 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,122 $1,000 Implemented
UM0323 # 11 Y:2007 11 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $946 $1,000 Implemented
UM0323 # 12 Y:2007 12 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $615 $75 Implemented
UM0323 # 13 Y:2007 13 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $513 $206 Implemented
SD0349 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,934 $4,300 Implemented
SD0349 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,757 $920 Implemented
SD0349 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,407 $3,423 Implemented
SD0349 # 06 Y:2004 06 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,780 $18,500 Implemented
NC0288 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,564 $435 Implemented
NC0288 # 02 Y:2004 02 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,570 $1,725 Implemented
NC0288 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $239 $100 Implemented
NC0288 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $15,216 $3,800 Implemented
SD0330 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $887 $80 Implemented
WV0275 # 02 Y:2003 02 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $29,059 $900 Implemented
WV0275 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,308 $0 Implemented
WV0275 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,654 $800 Implemented
WV0275 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,244 $8,370 Implemented
WV0275 # 08 Y:2003 08 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,170 $360 Implemented