IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
Reset
NAICS 332811 Metal Heat Treating
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0374 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,005 $1,355 Implemented
UF0374 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,895 $1,653 Implemented
UF0374 # 10 Y:2006 10 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,016 $0 Implemented
NC0315 # 01 Y:2005 01 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,232 $100,000 Implemented
NC0315 # 02 Y:2005 02 2005 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE $12,466 $45,000 Implemented
NC0315 # 03 Y:2005 03 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,799 $10,000 Implemented
NC0315 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,731 $0 Implemented
NC0315 # 05 Y:2005 05 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $535 $0 Implemented
NC0315 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $498 $100 Implemented
LM0092 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,281 $170 Implemented
LM0092 # 05 Y:2005 05 2005 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $62,655 $140,000 Implemented
LM0092 # 06 Y:2005 06 2005 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $12,597 $5,000 Implemented
LM0092 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,657 $5,000 Implemented
LM0092 # 08 Y:2005 08 2005 MAINTAIN/ENLARGE A STOCK OF SPARE PARTS $36,180 $5,000 Implemented
LM0092 # 09 Y:2005 09 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $98,438 $100,000 Implemented
LM0092 # 10 Y:2005 10 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $14,473 $100 Implemented
LM0092 # 11 Y:2005 11 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $1,200 $100 Implemented
LE0205 # 01 Y:2005 01 2005 INSTALL BACK-UP EQUIPMENT $65,962 $35,000 Implemented
LE0205 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,294 $2,500 Implemented
LE0205 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,521 $150 Implemented
SF0289 # 01 Y:2004 01 2004 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,527 $2,527 Implemented
SF0289 # 02 Y:2004 02 2004 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $956 $180 Implemented
SF0289 # 06 Y:2004 06 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $270 $885 Implemented
SF0289 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,750 $6,748 Implemented
LM0074 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $3,094 $231 Implemented