IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

278

matching recommendations
Reset
NAICS 332812 Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0398 # 07 Y:2009 07 2009 DEVELOP A REPAIR/REPLACE POLICY $11,204 $793 Implemented
WV0398 # 08 Y:2009 08 2009 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $10,882 $1,000 Implemented
WV0398 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,891 $900 Implemented
WV0398 # 11 Y:2009 11 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,235 $419 Implemented
WV0398 # 15 Y:2009 15 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,030 $0 Implemented
SF0359 # 01 Y:2008 01 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,430 $0 Implemented
SF0359 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $870 $904 Implemented
SF0359 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,576 $523 Implemented
SF0359 # 04 Y:2008 04 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,314 $1,577 Implemented
SF0359 # 06 Y:2008 06 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $197 $453 Implemented
SF0359 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $929 $4,808 Implemented
WV0371 # 01 Y:2008 01 2008 ADJUST BURNERS FOR EFFICIENT OPERATION $284,875 $10,157 Implemented
WV0371 # 03 Y:2008 03 2008 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $179,387 $235,000 Implemented
WV0371 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $42,970 $2,500 Implemented
WV0371 # 05 Y:2008 05 2008 DEVELOP A REPAIR/REPLACE POLICY $29,665 $1,823 Implemented
WV0371 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,829 $2,310 Implemented
WV0371 # 08 Y:2008 08 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $14,852 $2,980 Implemented
WV0371 # 09 Y:2008 09 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $13,433 $3,500 Implemented
WV0371 # 10 Y:2008 10 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,725 $683 Implemented
WV0371 # 11 Y:2008 11 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,269 $530 Implemented
LL0290 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,461 $8,520 Implemented
BD0333 # 01 Y:2007 01 2007 INSTALL OCCUPANCY SENSORS $1,570 $901 Implemented
BD0333 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $376 $476 Implemented
BD0333 # 06 Y:2007 06 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $819 $526 Implemented
BD0333 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $378 $2 Implemented