IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

278

matching recommendations
Reset
NAICS 332812 Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0009 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,681 $16,061 Implemented
UA0009 # 02 Y:2007 02 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $588 $0 Implemented
UA0009 # 04 Y:2007 04 2007 INSTALL TIMERS AND/OR THERMOSTATS $600 $236 Implemented
UA0009 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $528 $0 Implemented
UA0009 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $768 $525 Implemented
WV0326 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $6,011 $1,797 Implemented
WV0326 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,897 $14,339 Implemented
WV0326 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,386 $1,840 Implemented
WV0326 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,818 $1,000 Implemented
WV0326 # 07 Y:2005 07 2005 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $780 $1,076 Implemented
WV0326 # 08 Y:2005 08 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $652 $367 Implemented
WV0326 # 09 Y:2005 09 2005 USE SYNTHETIC LUBRICANT $577 $17 Implemented
WV0326 # 10 Y:2005 10 2005 DEVELOP A REPAIR/REPLACE POLICY $459 $54 Implemented
WV0326 # 12 Y:2005 12 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $295 $180 Implemented
IA0370 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,763 $1,492 Implemented
IA0370 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,500 $20,993 Implemented
IA0370 # 07 Y:2005 07 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,192 $0 Implemented
BD0292 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,591 $36,320 Implemented
BD0292 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,594 $7,360 Implemented
BD0292 # 03 Y:2005 03 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,205 $25,000 Implemented
BD0292 # 06 Y:2005 06 2005 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $1,915 $2,680 Implemented
BD0292 # 07 Y:2005 07 2005 BURN A LESS EXPENSIVE GRADE OF FUEL $1,500 $1,400 Implemented
LL0230 # 02 Y:2005 02 2005 PAY UTILITY BILLS ON TIME $22,903 $0 Implemented
SD0354 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,424 $320 Implemented
SD0354 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,367 $18,600 Implemented