IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

676

matching recommendations
Reset
NAICS 332812 Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0697 # 14 Y:2004 14 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $49 $0 Not Implemented
AS0368 # 01 Y:2004 01 2004 INSTALL EFFICIENT RECTIFIERS $79,520 $51,660 Not Implemented
AS0368 # 02 Y:2004 02 2004 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $66,870 $4,565 Not Implemented
AS0368 # 03 Y:2004 03 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,943 $52,000 Not Implemented
AS0368 # 04 Y:2004 04 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,650 $2,800 Not Implemented
AS0368 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,789 $5,720 Not Implemented
AS0368 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,743 $15 Not Implemented
AS0368 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,286 $7,980 Not Implemented
AS0368 # 08 Y:2004 08 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $192 $199 Not Implemented
MA0544 # 01 Y:2003 01 2003 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $3,663 $2,000 Implemented
MA0544 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $2,425 $2,000 Not Implemented
MA0544 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,646 $6,156 Implemented
MA0544 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $1,236 $600 Not Implemented
MA0544 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $543 $20 Implemented
OK0674 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,662 $13,792 Implemented
OK0674 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $748 $0 Not Implemented
OK0674 # 03 Y:2003 03 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,400 $0 Not Implemented
OK0674 # 04 Y:2003 04 2003 CHANGE OPERATING CONDITIONS $28,500 $40,604 Not Implemented
OK0674 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $143 $184 Not Implemented
UM0238 # 01 Y:2003 01 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $55,000 $24,610 Not Implemented
UM0238 # 02 Y:2003 02 2003 COVER OPEN TANKS $28,130 $2,624 Implemented
UM0238 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,191 $18,246 Not Implemented
UM0238 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,950 $150 Implemented
UM0238 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $6,485 $8,300 Implemented
UM0238 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $3,280 $2,600 Not Implemented