IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

375

matching recommendations
Reset
NAICS 332813 Electroplating, Plating, Polishing, Anodizing, and Coloring
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0017 # 09 Y:2013 09 2013 COVER OPEN TANKS $373 $503 Implemented
IP0017 # 10 Y:2013 10 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,437 $9,348 Implemented
UM0428 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,177 $9,000 Implemented
UM0428 # 04 Y:2013 04 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $636 $1,200 Implemented
UM0428 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $990 $100 Implemented
UM0428 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,106 $1,500 Implemented
SF0436 # 02 Y:2013 02 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $438 $0 Implemented
MAS035 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,986 $2,000 Implemented
MAS035 # 02 Y:2012 02 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,443 $0 Implemented
WV0457 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,986 $22,500 Implemented
WV0457 # 11 Y:2012 11 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $330 $50 Implemented
WV0457 # 07 Y:2012 07 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,189 $1,000 Implemented
WV0457 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $2,539 $5,407 Implemented
WV0457 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,482 $500 Implemented
MAS022 # 01 Y:2012 01 2012 INSULATE BARE EQUIPMENT $19,167 $20,900 Implemented
MAS022 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $4,821 $2,600 Implemented
MAS022 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,186 $4,660 Implemented
MAS022 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $875 $0 Implemented
IA0464 # 01 Y:2011 01 2011 REPAIR AND ELIMINATE STEAM LEAKS $1,766 $700 Implemented
IA0464 # 02 Y:2011 02 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $387 $290 Implemented
IA0464 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $380 $15 Implemented
IA0464 # 04 Y:2011 04 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,199 $45 Implemented
IA0464 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,295 $10,281 Implemented
IA0464 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,737 $33,313 Implemented
IA0464 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,378 $7,606 Implemented