IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 332813 Electroplating, Plating, Polishing, Anodizing, and Coloring
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0123 # 02 Y:2019 02 2019 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $248 $0 Implemented
IP0123 # 08 Y:2019 08 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $758 $2,290 Implemented
IP0123 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $442 $70 Implemented
IP0123 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $286 $7 Implemented
IP0123 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,165 $13,663 Implemented
IP0123 # 05 Y:2019 05 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,980 $440 Implemented
IP0111 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $780 $217 Implemented
IP0111 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $1,101 $893 Implemented
IP0111 # 09 Y:2018 09 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $180 $679 Implemented
IP0111 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,378 $0 Implemented
IP0068 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,287 $5,648 Implemented
IP0068 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $500 $285 Implemented
IP0068 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $491 $159 Implemented
IP0068 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $688 $5 Implemented
IP0068 # 01 Y:2016 01 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $759 $4 Implemented
IP0017 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $805 $0 Implemented
IP0017 # 10 Y:2013 10 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,437 $9,348 Implemented
IP0017 # 09 Y:2013 09 2013 COVER OPEN TANKS $373 $503 Implemented
IP0017 # 06 Y:2013 06 2013 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $600 $159 Implemented
IP0017 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,754 $409 Implemented
IP0017 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,167 $1,400 Implemented
IP0017 # 02 Y:2013 02 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,701 $0 Implemented
IC0106 # 13 Y:2005 13 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,662 $900 Implemented
IC0106 # 07 Y:2005 07 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,315 $0 Implemented
IC0106 # 06 Y:2005 06 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $513 $107 Implemented