IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
NAICS 332912 Fluid Power Valve and Hose Fitting Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0440 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $865 $3,750 Implemented
UM0440 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,534 $1,500 Implemented
UM0440 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,089 $500 Implemented
UM0440 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,152 $2,500 Implemented
UM0440 # 07 Y:2014 07 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $486 $1,250 Implemented
UM0440 # 08 Y:2014 08 2014 RECOVER WASTE HEAT FROM EQUIPMENT $958 $750 Implemented
IP0020 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,300 $0 Implemented
IP0020 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,216 $699 Implemented
IP0020 # 08 Y:2013 08 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $824 $176 Implemented
LE0341 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $656 $1,750 Implemented
LE0341 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,980 $36,125 Implemented
LE0341 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,160 $949 Implemented
WV0423 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $521 $89 Implemented
WV0423 # 09 Y:2011 09 2011 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $343 $177 Implemented
WV0423 # 12 Y:2011 12 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $272 $139 Implemented
WV0423 # 08 Y:2011 08 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $428 $183 Implemented
WV0423 # 06 Y:2011 06 2011 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $1,041 $1,000 Implemented
WV0423 # 05 Y:2011 05 2011 INSTALL TIMERS AND/OR THERMOSTATS $1,173 $2,443 Implemented
WV0423 # 04 Y:2011 04 2011 REPAIR AND ELIMINATE STEAM LEAKS $1,472 $626 Implemented
TT0063 # 04 Y:2011 04 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $900 $1,050 Implemented
MS0304 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $289,291 $222,009 Implemented
MS0304 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $118,243 $1,820 Implemented
MS0304 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,366 $16,063 Implemented
MS0304 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $7,010 $153 Implemented
LE0242 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $152 $75 Implemented