IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 332993 Ammunition (except Small Arms) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0980 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $12,254 $1,350 Implemented
UA0186 # 05 Y:2017 05 2017 INSTALL TIMERS AND/OR THERMOSTATS $1,297 $60 Implemented
UA0186 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,615 $4,645 Implemented
UA0186 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $1,872 $740 Implemented
LE0439 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,992 $5,000 Implemented
LE0439 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,903 $21,654 Implemented
LE0439 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,477 $600 Implemented
MA0689 # 13 Y:2012 13 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,032 $700 Implemented
MA0689 # 18 Y:2012 18 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $717 $200 Implemented
MA0689 # 17 Y:2012 17 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,042 $500 Implemented
MA0689 # 16 Y:2012 16 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,244 $1,000 Implemented
MA0689 # 15 Y:2012 15 2012 INSULATE BARE EQUIPMENT $1,579 $2,300 Implemented
MA0689 # 12 Y:2012 12 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,245 $1,500 Implemented
MA0689 # 11 Y:2012 11 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,144 $1,000 Implemented
MA0689 # 10 Y:2012 10 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,139 $5,200 Implemented
MA0689 # 09 Y:2012 09 2012 USE OPTIMUM TEMPERATURE $5,818 $900 Implemented
MA0689 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,677 $9,750 Implemented
MA0689 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,785 $3,000 Implemented
MA0689 # 04 Y:2012 04 2012 USE OPTIMUM TEMPERATURE $13,757 $8,000 Implemented
MA0689 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,784 $5,000 Implemented
MA0689 # 01 Y:2012 01 2012 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $85,000 $250,000 Implemented
SD0505 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,022 $2,400 Implemented
WV0421 # 07 Y:2011 07 2011 DEVELOP A REPAIR/REPLACE POLICY $4,203 $841 Implemented
WV0421 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $6,529 $2,469 Implemented
WV0421 # 16 Y:2011 16 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $266 $191 Implemented