IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122

matching recommendations
Reset
NAICS 332996 Fabricated Pipe and Pipe Fitting Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0286 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,971 $250 Implemented
WV0286 # 05 Y:2004 05 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,455 $1,770 Implemented
WV0286 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $1,353 $251 Implemented
WV0286 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $0 Implemented
WV0286 # 10 Y:2004 10 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $828 $283 Implemented
WV0286 # 11 Y:2004 11 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $743 $1,100 Implemented
WV0286 # 12 Y:2004 12 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $318 $250 Implemented
UM0249 # 01 Y:2004 01 2004 MAINTAIN MACHINES TO REDUCE LEAKS $78,906 $4,500 Implemented
UM0249 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,288 $20,400 Implemented
UM0249 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,027 $8,138 Implemented
UM0249 # 05 Y:2004 05 2004 OPTIMIZE PLANT POWER FACTOR $6,174 $27,270 Implemented
UM0249 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,436 $975 Implemented
WI0455 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $17,710 $2,500 Implemented
LM0064 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,721 $320 Implemented
LM0064 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,321 $200 Implemented
LM0064 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,099 $9,475 Implemented
LM0064 # 06 Y:2003 06 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $2,520 $0 Implemented
LM0064 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $453 $400 Implemented
LM0064 # 11 Y:2003 11 2003 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $360,180 $118,080 Implemented
LM0064 # 12 Y:2003 12 2003 MODIFY CURRENT INCENTIVE PROGRAM $34,000 $5,000 Implemented
LE0159 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,138 $300 Implemented
LE0159 # 04 Y:2003 04 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,620 $0 Implemented