IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
NAICS 332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0181 # 10 Y:2011 10 2011 REPAIR OR REPLACE STEAM TRAPS $7,948 $1,458 Implemented
IC0181 # 06 Y:2011 06 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $717 $2,886 Implemented
IC0181 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $19,167 $1,700 Implemented
IC0181 # 14 Y:2011 14 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $522 $0 Implemented
IC0181 # 08 Y:2011 08 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,382 $0 Implemented
IC0181 # 02 Y:2011 02 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $850 $402 Implemented
IC0181 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $91 $29 Implemented
IC0181 # 07 Y:2011 07 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,521 $600 Implemented
IC0181 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,391 $4,830 Implemented
IC0181 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $533 $0 Implemented
IC0181 # 11 Y:2011 11 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $1,962 $4,127 Implemented
IC0181 # 13 Y:2011 13 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $33 $0 Implemented
BD0374 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,008 $3,000 Implemented
BD0374 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $678 $875 Implemented
BD0374 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $440 $1,000 Implemented
BD0278 # 06 Y:2005 06 2005 RECOVER AND REUSE COOLING WATER $1,459 $5,000 Implemented
BD0278 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,148 $2,000 Implemented
BD0278 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,770 $3,597 Implemented
BD0278 # 03 Y:2005 03 2005 INSTALL OCCUPANCY SENSORS $1,527 $525 Implemented
BD0278 # 01 Y:2005 01 2005 USE RADIANT HEATER FOR SPOT HEATING $4,205 $16,000 Implemented
BD0275 # 07 Y:2005 07 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,119 $6,000 Implemented
BD0275 # 12 Y:2005 12 2005 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $67,500 $2,580 Implemented
BD0276 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,544 $48,000 Implemented
BD0275 # 11 Y:2005 11 2005 INSTALL AUTOMATIC PACKING EQUIPMENT $121,680 $500,000 Implemented
BD0275 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,985 $421 Implemented