Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsNAICS | 332999 | All Other Miscellaneous Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1080 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,018 | $924 | Implemented |
UD1080 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $808 | $941 | Implemented |
UD1080 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,541 | $11,151 | Implemented |
WV0565 # 08 Y:2018 | 08 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $704 | $40 | Implemented |
WV0565 # 05 Y:2018 | 05 | 2018 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,441 | $500 | Implemented |
WV0565 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $810 | $1,600 | Implemented |
WV0565 # 04 Y:2018 | 04 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $2,854 | $533 | Implemented |
WV0565 # 02 Y:2018 | 02 | 2018 | INSTALL OCCUPANCY SENSORS | $77,310 | $17,740 | Implemented |
WV0527 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,524 | $60 | Implemented |
WV0527 # 02 Y:2016 | 02 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,539 | $1,100 | Implemented |
WV0527 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,268 | $2,530 | Implemented |
WV0527 # 08 Y:2016 | 08 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,044 | $165 | Implemented |
WV0527 # 09 Y:2016 | 09 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $581 | $1,275 | Implemented |
WV0527 # 10 Y:2016 | 10 | 2016 | INSULATE BARE EQUIPMENT | $252 | $263 | Implemented |
WV0527 # 11 Y:2016 | 11 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $212 | $527 | Implemented |
UD0927 # 02 Y:2015 | 02 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,025 | $0 | Implemented |
UD0927 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,022 | $300 | Implemented |
UD0802 # 10 Y:2009 | 10 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,334 | $1,000 | Implemented |
UD0802 # 09 Y:2009 | 09 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $487 | $2,374 | Implemented |
UD0802 # 08 Y:2009 | 08 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $797 | $1,907 | Implemented |
UD0802 # 06 Y:2009 | 06 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,230 | $1,500 | Implemented |
UD0802 # 03 Y:2009 | 03 | 2009 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,645 | $0 | Implemented |
UD0802 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,384 | $29,087 | Implemented |
UD0714 # 10 Y:2005 | 10 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,296 | $0 | Implemented |
UD0714 # 09 Y:2005 | 09 | 2005 | MINIMIZE WATER USAGE | $1,311 | $1,200 | Implemented |