IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0549 # 04 Y:2008 04 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $8,050 $0 Implemented
AM0549 # 05 Y:2008 05 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,260 $615 Implemented
AM0549 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,220 $1,410 Implemented
UF0411 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,287 $40,292 Implemented
UF0411 # 04 Y:2008 04 2008 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,258 $461 Implemented
UF0411 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $1,200 $215 Implemented
UF0411 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,144 $426 Implemented
UF0411 # 13 Y:2008 13 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $110,982 $0 Implemented
NC0375 # 03 Y:2008 03 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,903 $7,500 Implemented
NC0375 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,473 $1,680 Implemented
NC0375 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,999 $4,820 Implemented
NC0375 # 06 Y:2008 06 2008 DEVELOP A REPAIR/REPLACE POLICY $1,686 $2,173 Implemented
UD0775 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $2,738 Implemented
UD0775 # 02 Y:2008 02 2008 INSTALL AUTOMATIC STACK DAMPER $650 $400 Implemented
UD0775 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $343 $300 Implemented
UD0775 # 08 Y:2008 08 2008 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $95 $0 Implemented
UD0775 # 09 Y:2008 09 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $82 $0 Implemented
IA0419 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $678 $25 Implemented
IA0419 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,055 $500 Implemented
IA0419 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $758 $1,001 Implemented
IA0419 # 07 Y:2007 07 2007 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,450 $1,200 Implemented
IA0419 # 09 Y:2007 09 2007 RECOVER WASTE HEAT FROM EQUIPMENT $2,583 $3,300 Implemented
IA0419 # 10 Y:2007 10 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,325 $800 Implemented
MA0629 # 01 Y:2008 01 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,363 $2,800 Implemented
MA0629 # 05 Y:2008 05 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $450 $1,620 Implemented