IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,345

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0229 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,266 $9,660 Not Implemented
BD0229 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,676 $3,857 Implemented
BD0229 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $1,328 $1,275 Not Implemented
BD0229 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $736 $1,500 Not Implemented
BD0229 # 08 Y:2003 08 2003 USE PHOTOCELL CONTROLS $506 $500 Implemented
BD0229 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $299 $0 Not Implemented
BD0229 # 10 Y:2003 10 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,032 $72 Not Implemented
BD0229 # 11 Y:2003 11 2003 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,958 $5,500 Not Implemented
BD0229 # 12 Y:2003 12 2003 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $624 $600 Not Implemented
SU0155 # 01 Y:2003 01 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $20,634 $768 Not Implemented
SU0155 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,787 $1,200 Implemented
SU0155 # 03 Y:2003 03 2003 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $4,200 $8,636 Not Implemented
SU0155 # 04 Y:2003 04 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,056 $0 Implemented
SU0155 # 05 Y:2003 05 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,016 $0 Implemented
SU0155 # 06 Y:2003 06 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $2,195 $4,877 Not Implemented
SU0155 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,755 $320 Implemented
SU0155 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,406 $420 Not Implemented
SU0155 # 09 Y:2003 09 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $901 $1,660 Not Implemented
SU0155 # 10 Y:2003 10 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $381 $500 Implemented
SU0155 # 11 Y:2003 11 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $326 $0 Implemented
MS0221 # 01 Y:2003 01 2003 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $202,950 $8,100 Implemented
MS0221 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,072 $12,006 Not Implemented
MS0221 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,834 $782 Implemented
MS0221 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $460 $585 Not Implemented
UD0662 # 01 Y:2003 01 2003 IMPROVE SPACE COMFORT CONDITIONING $4,100 $5,938 Implemented