IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

547

matching recommendations
Reset
NAICS 3331 Agriculture, Construction, and Mining Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0121 # 03 Y:2022 03 2022 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $3,746 $265 Implemented
CW0121 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,231 $26,058 Implemented
CW0121 # 01 Y:2022 01 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,129 $400 Implemented
UA0252 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $13,657 $8,080 Implemented
UA0252 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,634 $850 Implemented
UA0252 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $32,927 $257 Implemented
LS2208 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,440 $14,643 Implemented
LS2208 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,527 $450 Implemented
LS2208 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $7,289 $200 Implemented
OK1064 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,414 $774 Implemented
OK1064 # 03 Y:2022 03 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $367 $700 Implemented
OK1064 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,321 $22,000 Implemented
OR0748 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $2,032 $9,520 Implemented
OR0748 # 04 Y:2022 04 2022 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $99,431 $292,453 Implemented
OR0748 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $3,913 $10,533 Implemented
OR0748 # 02 Y:2022 02 2022 FILTER AND REUSE HYDRAULIC OIL $34,830 $88,699 Implemented
OR0748 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,763 $1,880 Implemented
WM0166 # 04 Y:2021 04 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,198 $2,170 Implemented
WV0608 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,836 $1,100 Implemented
WV0608 # 04 Y:2021 04 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $952 $0 Implemented
WV0608 # 05 Y:2021 05 2021 DEVELOP A REPAIR/REPLACE POLICY $746 $300 Implemented
TT0245 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,143 $150 Implemented
TT0245 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,084 $1,500 Implemented
AM0811 # 06 Y:2020 06 2020 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $460 $200 Implemented
AM0811 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,530 $255 Implemented