IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 3331 Agriculture, Construction, and Mining Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0216 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,835 $0 Implemented
WM0216 # 04 Y:2024 04 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $447 $2,948 Implemented
WM0208 # 07 Y:2024 07 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $430 $700 Implemented
WM0208 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,014 $4,664 Implemented
WM0208 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,761 $1,950 Implemented
WM0208 # 02 Y:2024 02 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,702 $8,700 Implemented
WM0166 # 04 Y:2021 04 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,198 $2,170 Implemented
WM0155 # 10 Y:2020 10 2020 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $360 $0 Implemented
WM0155 # 09 Y:2020 09 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $366 $1,250 Implemented
WM0131 # 03 Y:2019 03 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $18,069 $5,612 Implemented
WM0131 # 04 Y:2019 04 2019 USE SYNTHETIC LUBRICANT $14,757 $10,000 Implemented
WM0131 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,086 $4,750 Implemented
WM0131 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,069 $1,500 Implemented
WM0131 # 08 Y:2019 08 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,915 $0 Implemented
WM0051 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,050 $225 Implemented
WM0051 # 09 Y:2014 09 2014 REPLACE BOILER $11,306 $16,000 Implemented
WM0051 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,648 $27,260 Implemented
WM0047 # 10 Y:2014 10 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,430 $1,180 Implemented
WM0047 # 09 Y:2014 09 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,932 $2,100 Implemented
WM0047 # 04 Y:2014 04 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,970 $0 Implemented
WM0047 # 01 Y:2014 01 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,205 $13,000 Implemented
WI0523 # 06 Y:2006 06 2006 USE SYNTHETIC LUBRICANT $1,970 $0 Implemented
WI0523 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,347 $1,000 Implemented