IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

132

matching recommendations
Reset
NAICS 333111 Farm Machinery and Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0741 # 04 Y:2006 04 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $16,240 $0 Implemented
UD0741 # 05 Y:2006 05 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $9,135 $2,800 Implemented
UD0741 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,802 $840 Implemented
UD0741 # 08 Y:2006 08 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,097 $0 Implemented
UD0741 # 09 Y:2006 09 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,261 $0 Implemented
LL0228 # 01 Y:2005 01 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $79,796 $4,000 Implemented
LL0228 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $47,819 $22,000 Implemented
LL0228 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,945 $0 Implemented
LL0228 # 11 Y:2005 11 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $106,500 $20,000 Implemented
LL0228 # 12 Y:2005 12 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $80,610 $20,000 Implemented
IA0360 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,348 $526 Implemented
IA0360 # 06 Y:2005 06 2005 INSTALL STORM WINDOWS AND DOORS $2,828 $4,371 Implemented
IA0360 # 07 Y:2005 07 2005 MAINTAIN MACHINES TO REDUCE LEAKS $656 $147 Implemented
IA0360 # 09 Y:2005 09 2005 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $3,570 $400 Implemented
SU0203 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,367 $366 Implemented
SU0203 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,129 $308 Implemented
SU0203 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,105 $960 Implemented
IA0341 # 02 Y:2004 02 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,502 $700 Implemented
IA0341 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,519 $460 Implemented
IA0341 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $727 $105 Implemented
IA0341 # 05 Y:2004 05 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,040 $54,300 Implemented
IA0341 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $182 $194 Implemented
IA0341 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $874 $1,990 Implemented
IA0341 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $123 $289 Implemented
UD0675 # 01 Y:2003 01 2003 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $26,842 $625 Implemented