IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

391

matching recommendations
Reset
NAICS 33351 Metalworking Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0293 # 06 Y:2005 06 2005 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $227 $200 Implemented
SD0372 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,173 $140 Implemented
SD0372 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,723 $16,563 Implemented
TA0103 # 02 Y:2005 02 2005 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,365 $2,620 Implemented
TA0103 # 03 Y:2005 03 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $14,113 $0 Implemented
TA0103 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,990 $0 Implemented
TA0103 # 05 Y:2005 05 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $700 $1,070 Implemented
MA0583 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,565 $29,567 Implemented
MA0583 # 02 Y:2005 02 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,360 $1,180 Implemented
MA0583 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $4,215 $0 Implemented
MA0583 # 04 Y:2005 04 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,148 $0 Implemented
MA0583 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $826 $0 Implemented
MA0583 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $228 $0 Implemented
MA0583 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $105 $296 Implemented
MA0583 # 08 Y:2005 08 2005 RECOVER WASTE HEAT FROM EQUIPMENT $79 $318 Implemented
MA0587 # 02 Y:2005 02 2005 COMBINE UTILITY METERS $4,300 $15,675 Implemented
MA0587 # 03 Y:2005 03 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $875 $1,210 Implemented
MA0587 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $392 $900 Implemented
UD0727 # 01 Y:2005 01 2005 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $41,013 $0 Implemented
UD0727 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,195 $31,250 Implemented
UD0727 # 03 Y:2005 03 2005 USE PHOTOCELL CONTROLS $12,030 $0 Implemented
UD0727 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,196 $15,000 Implemented
UD0727 # 05 Y:2005 05 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,131 $0 Implemented
UD0727 # 06 Y:2005 06 2005 UPGRADE CONTROLS ON COMPRESSORS $3,921 $0 Implemented
UD0727 # 07 Y:2005 07 2005 UPGRADE CONTROLS ON COMPRESSORS $2,776 $1,448 Implemented