IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
NAICS 33351 Metalworking Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0112 # 09 Y:2020 09 2020 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $51,045 $2,000 Implemented
CW0112 # 07 Y:2020 07 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,966 $800 Implemented
CW0112 # 06 Y:2020 06 2020 TREAT AND REUSE RINSE WATERS $15,861 $10,000 Implemented
CW0112 # 10 Y:2020 10 2020 INCREASE USE OF AUTOMATION $749,435 $60,000 Implemented
CW0112 # 13 Y:2020 13 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,095 $16,500 Implemented
CW0112 # 12 Y:2020 12 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $342 $0 Implemented
CW0112 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,912 $330 Implemented
CW0112 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,658 $100 Implemented
CW0112 # 04 Y:2020 04 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,678 $800 Implemented
UD0960 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $10,808 $0 Implemented
UD0960 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,390 $1,000 Implemented
UD0960 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $17,273 $0 Implemented
UD0960 # 01 Y:2017 01 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,202 $0 Implemented
UD0960 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,385 $0 Implemented
UD0960 # 06 Y:2017 06 2017 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $514 $1,425 Implemented
WV0503 # 07 Y:2015 07 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $915 $1,000 Implemented
WV0503 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $283 $630 Implemented
WV0503 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $407 $448 Implemented
WV0503 # 04 Y:2015 04 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,899 $500 Implemented
WV0503 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,831 $374 Implemented
WV0503 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,499 $3,530 Implemented
UD0847 # 11 Y:2012 11 2012 REDUCE VENTILATION AIR $5,243 $0 Implemented
UD0847 # 12 Y:2012 12 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,403 $22,015 Implemented
UD0847 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $4,177 $0 Implemented
WV0427 # 04 Y:2011 04 2011 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,867 $637 Implemented