Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
800
matching recommendationsNAICS | 33351 | Metalworking Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0059 # 10 Y:2010 | 10 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,000 | $15,000 | Implemented |
IC0177 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $206 | $1 | Implemented |
IC0177 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,982 | $15,752 | Implemented |
IC0177 # 03 Y:2010 | 03 | 2010 | INSTALL OCCUPANCY SENSORS | $1,091 | $3,544 | Not Implemented |
IC0177 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $667 | $212 | Not Implemented |
IC0177 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $150 | $1 | Not Implemented |
IC0177 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $252 | $1,520 | Not Implemented |
UM0371 # 01 Y:2010 | 01 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $70,732 | $1,319,976 | Implemented |
UM0371 # 02 Y:2010 | 02 | 2010 | OPTIMIZE PLANT POWER FACTOR | $60,000 | $50,000 | Implemented |
UM0371 # 03 Y:2010 | 03 | 2010 | INSTALL OCCUPANCY SENSORS | $18,676 | $3,128 | Implemented |
UM0371 # 04 Y:2010 | 04 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $4,729 | $10 | Implemented |
UM0371 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,092 | $35,268 | Implemented |
UM0371 # 06 Y:2010 | 06 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,475 | $3,500 | Implemented |
UM0371 # 07 Y:2010 | 07 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,530 | $300,000 | Not Implemented |
TT0056 # 01 Y:2010 | 01 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,872 | $11,208 | Not Implemented |
TT0056 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,661 | $45,225 | Not Implemented |
TT0056 # 03 Y:2010 | 03 | 2010 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $8,445 | $1,444 | Not Implemented |
TT0056 # 04 Y:2010 | 04 | 2010 | INSTALL SKYLIGHTS | $16,932 | $88,000 | Not Implemented |
TT0056 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,966 | $21,900 | Not Implemented |
WV0409 # 01 Y:2010 | 01 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,346 | $55,900 | Not Implemented |
WV0409 # 02 Y:2010 | 02 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,013 | $7,800 | Not Implemented |
WV0409 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,475 | $2,838 | Implemented |
WV0409 # 04 Y:2010 | 04 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $3,087 | $625 | Implemented |
WV0409 # 05 Y:2010 | 05 | 2010 | RECOVER MECHANICAL ENERGY | $2,064 | $1,000 | Not Implemented |
WV0409 # 06 Y:2010 | 06 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,693 | $985 | Not Implemented |