Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
64
matching recommendationsNAICS | 333514 | Special Die and Tool, Die Set, Jig, and Fixture Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0948 # 02 Y:2020 | 02 | 2020 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,998 | $2,000 | Implemented |
GT0948 # 03 Y:2020 | 03 | 2020 | AIR CONDITION ONLY SPACE NECESSARY | $6,270 | $2,979 | Implemented |
GT0948 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $8,479 | $4,145 | Implemented |
GT0948 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,214 | $12,496 | Implemented |
GT0948 # 06 Y:2020 | 06 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $722 | $1,492 | Implemented |
GT0948 # 01 Y:2020 | 01 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,480 | $2,300 | Implemented |
TT0188 # 02 Y:2017 | 02 | 2017 | USE POWER DURING OFF-PEAK PERIODS | $10,583 | $100 | Implemented |
TT0188 # 04 Y:2017 | 04 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,153 | $890 | Implemented |
SD0485 # 02 Y:2014 | 02 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $31,720 | $5,000 | Implemented |
SD0485 # 07 Y:2014 | 07 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,832 | $4,400 | Implemented |
SD0485 # 06 Y:2014 | 06 | 2014 | USE PHOTOCELL CONTROLS | $1,975 | $5,550 | Implemented |
SD0485 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,114 | $1,000 | Implemented |
SD0485 # 04 Y:2014 | 04 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $13,807 | $28,125 | Implemented |
SD0485 # 03 Y:2014 | 03 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $25,053 | $91,900 | Implemented |
WM0011 # 01 Y:2012 | 01 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $14,000 | $0 | Implemented |
WM0011 # 03 Y:2012 | 03 | 2012 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $293 | $265 | Implemented |
WM0011 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,063 | $440 | Implemented |
WM0011 # 09 Y:2012 | 09 | 2012 | IMPROVE SPACE COMFORT CONDITIONING | $2,993 | $3,000 | Implemented |
UD0847 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,177 | $0 | Implemented |
UD0847 # 12 Y:2012 | 12 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,403 | $22,015 | Implemented |
UD0847 # 11 Y:2012 | 11 | 2012 | REDUCE VENTILATION AIR | $5,243 | $0 | Implemented |
UM0364 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,618 | $7,917 | Implemented |
UM0364 # 04 Y:2010 | 04 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $913 | $2,000 | Implemented |
UM0364 # 06 Y:2010 | 06 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,735 | $500 | Implemented |
UM0364 # 05 Y:2010 | 05 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,885 | $5,500 | Implemented |