IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
NAICS 333514 Special Die and Tool, Die Set, Jig, and Fixture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0287 # 01 Y:2010 01 2010 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,962 $0 Implemented
SU0287 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,424 $0 Implemented
SU0287 # 03 Y:2010 03 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,705 $0 Implemented
SU0287 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,950 $338 Implemented
SU0287 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,701 $1,174 Implemented
SU0279 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,498 $748 Implemented
SU0279 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,367 $0 Implemented
SU0279 # 04 Y:2009 04 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $319 $0 Implemented
SU0279 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $204 $305 Implemented
SU0279 # 02 Y:2009 02 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,002 $0 Implemented
SU0279 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,866 $10,242 Implemented
UD0738 # 11 Y:2006 11 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $382 $459 Implemented
UD0738 # 09 Y:2006 09 2006 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $658 $500 Implemented
UD0738 # 08 Y:2006 08 2006 UPGRADE CONTROLS ON COMPRESSORS $859 $0 Implemented
UD0738 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,348 $500 Implemented
UD0738 # 04 Y:2006 04 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,084 $0 Implemented
UD0738 # 01 Y:2006 01 2006 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $91,800 $6,000 Implemented
UD0738 # 03 Y:2006 03 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $8,313 $0 Implemented
UM0293 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,861 $18,165 Implemented
UM0293 # 03 Y:2005 03 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,085 $50 Implemented
UM0293 # 06 Y:2005 06 2005 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $227 $200 Implemented
UM0293 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,506 $175 Implemented
UD0727 # 09 Y:2005 09 2005 UPGRADE CONTROLS ON COMPRESSORS $781 $340 Implemented
UD0727 # 07 Y:2005 07 2005 UPGRADE CONTROLS ON COMPRESSORS $2,776 $1,448 Implemented
UD0727 # 06 Y:2005 06 2005 UPGRADE CONTROLS ON COMPRESSORS $3,921 $0 Implemented