IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167

matching recommendations
Reset
NAICS 333613 Mechanical Power Transmission Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0312 # 11 Y:2011 11 2011 OPTIMIZE PLANT POWER FACTOR $1,695 $15,783 Not Implemented
SU0312 # 12 Y:2011 12 2011 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $276 $4,481 Implemented
BD0388 # 01 Y:2011 01 2011 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $12,465 $60,000 Not Implemented
BD0388 # 02 Y:2011 02 2011 USE RADIANT HEATER FOR SPOT HEATING $30,750 $20,000 Not Implemented
BD0388 # 03 Y:2011 03 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,470 $4,000 Not Implemented
BD0388 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,581 $1,200 Not Implemented
BD0388 # 05 Y:2011 05 2011 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $63,847 $26,000 Not Implemented
IC0140 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,573 $4,032 Not Implemented
IC0140 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $540 $1,133 Not Implemented
IC0140 # 03 Y:2008 03 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $12,321 $0 Not Implemented
IC0140 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,900 $1,940 Not Implemented
IC0140 # 05 Y:2008 05 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,785 $2,728 Not Implemented
IC0140 # 06 Y:2008 06 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,146 $80,600 Not Implemented
IC0140 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,093 $5,980 Not Implemented
IC0140 # 08 Y:2008 08 2008 USE OPTIMUM THICKNESS INSULATION $19,374 $4,100 Not Implemented
IC0140 # 09 Y:2008 09 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $135 $0 Not Implemented
IC0140 # 10 Y:2008 10 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,616 $0 Not Implemented
IC0140 # 11 Y:2008 11 2008 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $9,973 $0 Not Implemented
MA0616 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,636 $132,834 Not Implemented
MA0616 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,128 $3,725 Not Implemented
MA0616 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,603 $2,550 Implemented
MA0616 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $37,450 $12,998 Not Implemented
MA0616 # 05 Y:2007 05 2007 INSTALL TIMERS AND/OR THERMOSTATS $16,346 $1,088 Not Implemented
MA0616 # 06 Y:2007 06 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $709 $300 Not Implemented
TT0001 # 01 Y:2007 01 2007 MODERATE COOLING TOWER OUTLET TEMPERATURE $2,856 $3,500 Implemented