Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsNAICS | 3339 | Other General Purpose Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0903 # 10 Y:2015 | 10 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,904 | $10,062 | Implemented |
OK0903 # 09 Y:2015 | 09 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,183 | $950 | Implemented |
OK0903 # 04 Y:2015 | 04 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,633 | $30,000 | Implemented |
OK0903 # 03 Y:2015 | 03 | 2015 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $3,411 | $228 | Implemented |
OK0903 # 02 Y:2015 | 02 | 2015 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $96,611 | $20,611 | Implemented |
OK0896 # 07 Y:2014 | 07 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $746 | $169 | Implemented |
OK0896 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,702 | $400 | Implemented |
OK0896 # 02 Y:2014 | 02 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,653 | $1,751 | Implemented |
OK0859 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,187 | $7,856 | Implemented |
OK0859 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,550 | $3,000 | Implemented |
OK0859 # 10 Y:2013 | 10 | 2013 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $17,170 | $30,000 | Implemented |
OK0859 # 13 Y:2013 | 13 | 2013 | REDUCE HEAT GAIN BY WINDOW TINTING | $3,200 | $6,500 | Implemented |
OK0859 # 14 Y:2013 | 14 | 2013 | REDUCE HEAT GAIN BY WINDOW TINTING | $372 | $0 | Implemented |
OK0812 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,843 | $750 | Implemented |
OK0812 # 09 Y:2011 | 09 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $801 | $353 | Implemented |
OK0812 # 08 Y:2011 | 08 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,925 | $14,300 | Implemented |
OK0812 # 04 Y:2011 | 04 | 2011 | INSTALL OCCUPANCY SENSORS | $6,323 | $26,111 | Implemented |
OK0812 # 01 Y:2011 | 01 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $34,390 | $92,072 | Implemented |
OK0743 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $21,613 | $2,450 | Implemented |
OK0743 # 07 Y:2007 | 07 | 2007 | INSULATE BARE EQUIPMENT | $5,413 | $723 | Implemented |
OK0743 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,720 | $5,010 | Implemented |
OK0743 # 02 Y:2007 | 02 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,189 | $569 | Implemented |
OK0743 # 03 Y:2007 | 03 | 2007 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $642 | $6,000 | Implemented |
OK0743 # 04 Y:2007 | 04 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,598 | $3,500 | Implemented |
OK0720 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,282 | $9,940 | Implemented |