IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

497

matching recommendations
Reset
NAICS 33392 Material Handling Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0575 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $940 $70 Implemented
WV0575 # 04 Y:2019 04 2019 INSTALL SET-BACK TIMERS $1,692 $105 Implemented
WV0575 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,872 $896 Implemented
WV0575 # 02 Y:2019 02 2019 UPGRADE CONTROLS ON COMPRESSORS $2,374 $8,525 Not Implemented
WV0575 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,365 $5,150 Not Implemented
TT0219 # 08 Y:2019 08 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,757 $16,291 Implemented
TT0219 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,725 $12,000 Not Implemented
TT0219 # 06 Y:2019 06 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,306 $18,000 Not Implemented
TT0219 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,337 $31,000 Not Implemented
TT0219 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $18,588 $10,000 Not Implemented
TT0219 # 03 Y:2019 03 2019 USE OPTIMUM THICKNESS INSULATION $27,754 $105,000 Implemented
TT0219 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $50,161 $360 Implemented
TT0219 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $53,170 $61,967 Implemented
TT0219 # 09 Y:2019 09 2019 APPLY FOR INVESTMENT INCENTIVES $1,440 $0 Implemented
WM0128 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,391 $22,752 Implemented
WM0128 # 02 Y:2018 02 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $20,855 $48,500 Not Implemented
WM0128 # 03 Y:2018 03 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,244 $6,840 Not Implemented
WM0128 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,118 $19,300 Implemented
WM0128 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,496 $2,000 Implemented
WM0128 # 06 Y:2018 06 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,084 $0 Implemented
WM0128 # 07 Y:2018 07 2018 USE RADIANT HEATER FOR SPOT HEATING $1,744 $5,250 Implemented
WM0128 # 08 Y:2018 08 2018 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $1,291 $533 Not Implemented
WM0128 # 09 Y:2018 09 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $804 $1,172 Implemented
WM0128 # 10 Y:2018 10 2018 INSTALL OCCUPANCY SENSORS $765 $600 Not Implemented
WM0128 # 11 Y:2018 11 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $637 $740 Implemented