Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsNAICS | 333995 | Fluid Power Cylinder and Actuator Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1314 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,739 | $4,500 | Implemented |
UK1314 # 02 Y:2013 | 02 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,512 | $28,560 | Implemented |
UK1314 # 07 Y:2013 | 07 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,662 | $650 | Implemented |
UK1314 # 06 Y:2013 | 06 | 2013 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,594 | $0 | Implemented |
UK1314 # 05 Y:2013 | 05 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,066 | $0 | Implemented |
UK1314 # 04 Y:2013 | 04 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,453 | $15,000 | Implemented |
UK1314 # 08 Y:2013 | 08 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $798 | $700 | Implemented |
UK1314 # 01 Y:2013 | 01 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,434 | $44,000 | Implemented |
UK1314 # 09 Y:2013 | 09 | 2013 | USE PHOTOCELL CONTROLS | $328 | $592 | Implemented |
UK1314 # 10 Y:2013 | 10 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $690 | $690 | Implemented |
IP0011 # 09 Y:2013 | 09 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,010 | $27,442 | Implemented |
IP0011 # 05 Y:2013 | 05 | 2013 | SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS | $980 | $0 | Implemented |
IP0011 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,428 | $0 | Implemented |
IP0011 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,058 | $0 | Implemented |
IP0011 # 02 Y:2013 | 02 | 2013 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $12,093 | $0 | Implemented |
IP0011 # 01 Y:2013 | 01 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,897 | $0 | Implemented |
UA0091 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $710 | $1,300 | Implemented |
UA0091 # 03 Y:2012 | 03 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $2,368 | $546 | Implemented |
IP0004 # 03 Y:2012 | 03 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,110 | $0 | Implemented |
IP0004 # 04 Y:2012 | 04 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $21,686 | $18,150 | Implemented |
IP0004 # 02 Y:2012 | 02 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,343 | $0 | Implemented |
IP0004 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,520 | $0 | Implemented |
IA0472 # 08 Y:2011 | 08 | 2011 | INSTALL OCCUPANCY SENSORS | $421 | $1,228 | Implemented |
IA0472 # 07 Y:2011 | 07 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,172 | $10,141 | Implemented |
IA0472 # 04 Y:2011 | 04 | 2011 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $1,084 | $358 | Implemented |