IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,149

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0071 # 05 Y:2004 05 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,879 $0 Implemented
LM0071 # 07 Y:2004 07 2004 $3,000 $300 Implemented
LM0071 # 10 Y:2004 10 2004 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $84,322 $100,000 Implemented
SU0178 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $26,400 $0 Implemented
SU0178 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,746 $527 Implemented
SU0178 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $580 $214 Implemented
SU0178 # 05 Y:2004 05 2004 OPTIMIZE PLANT POWER FACTOR $5,392 $15,432 Implemented
MA0546 # 04 Y:2004 04 2004 REDUCE VENTILATION AIR $7,495 $1,200 Implemented
MA0546 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,827 $4,972 Implemented
MA0546 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,243 $3,230 Implemented
MA0546 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $832 $3,000 Implemented
IC0071 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,349 $3,502 Implemented
IC0071 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,250 $3,184 Implemented
IC0071 # 06 Y:2003 06 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,367 $0 Implemented
IC0071 # 07 Y:2003 07 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $553 $0 Implemented
IC0071 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $11,135 $0 Implemented
IC0071 # 09 Y:2003 09 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,477 $5,700 Implemented
IC0071 # 10 Y:2003 10 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $339 $1,887 Implemented
AM0447 # 02 Y:2003 02 2003 AIR CONDITION ONLY SPACE NECESSARY $9,640 $190 Implemented
AM0447 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,150 $200 Implemented
AM0447 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $830 Implemented
AM0447 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,655 $560 Implemented
MA0541 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,264 $5,500 Implemented
MA0541 # 06 Y:2003 06 2003 USE MINIMUM STEAM OPERATING PRESSURE $5,023 $5,000 Implemented
MA0541 # 08 Y:2003 08 2003 INSULATE BARE EQUIPMENT $635 $260 Implemented