IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

76

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0591 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,430 $200 Implemented
CO0591 # 07 Y:2006 07 2006 DISCONNECT BALLASTS $310 $110 Implemented
CO0591 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $610 $0 Implemented
LE0240 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,994 $500 Implemented
LE0240 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,178 $4,500 Implemented
LE0240 # 08 Y:2006 08 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $192 $300 Implemented
LE0240 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $331 $300 Implemented
LE0240 # 01 Y:2006 01 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $265,405 $500,000 Implemented
LE0240 # 03 Y:2006 03 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,974 $2,092 Implemented
LE0240 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,308 $2,500 Implemented
OR0500 # 01 Y:2006 01 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,000 $31,500 Implemented
OR0500 # 02 Y:2006 02 2006 INSTALL COMMON HEADER ON COMPRESSORS $36,300 $31,500 Implemented
OR0500 # 03 Y:2006 03 2006 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $39,400 $42,000 Implemented
OK0733 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $1,460 $3,919 Implemented
OK0733 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $442 $1,360 Implemented
OK0733 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,077 $9,738 Implemented
OK0733 # 03 Y:2006 03 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,003 $980 Implemented
OK0733 # 02 Y:2006 02 2006 INSTALL OCCUPANCY SENSORS $6,122 $13,600 Implemented
AS0426 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,539 $15,085 Implemented
AS0426 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,221 $1,000 Implemented
AS0426 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $8,267 $2,077 Implemented
AS0426 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,823 $500 Implemented
WV0344 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $18,000 $32,500 Implemented
WV0344 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,355 $12,137 Implemented
WV0344 # 06 Y:2006 06 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,147 $26,662 Implemented