IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

103

matching recommendations
Reset
NAICS 33441 Semiconductor and Other Electronic Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0681 # 13 Y:2003 13 2003 DISCONNECT BALLASTS $159 $46 Implemented
UD0681 # 14 Y:2003 14 2003 INSTALL OCCUPANCY SENSORS $105 $160 Not Implemented
CO0528 # 01 Y:2003 01 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,940 $4,360 Implemented
CO0528 # 02 Y:2003 02 2003 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $13,340 $14,640 Not Implemented
CO0528 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,850 $16,010 Not Implemented
CO0528 # 04 Y:2003 04 2003 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,000 $3,000 Not Implemented
CO0528 # 05 Y:2003 05 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,720 $13,150 Not Implemented
CO0528 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,940 $10,310 Not Implemented
OR0432 # 01 Y:2003 01 2003 RECYCLE SPENT TANNING SOLUTION $136,000 $280,000 Not Implemented
OR0432 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $25,900 $32,000 Implemented
OR0432 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,830 $1,200 Implemented
OR0432 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,230 $7,640 Implemented
OR0432 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $8,813 $8,813 Not Implemented
TA0059 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $9,950 $0 Not Implemented
TA0059 # 02 Y:2003 02 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $5,536 $500 Not Implemented
TA0059 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,885 $7,671 Implemented
TA0059 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,890 $200 Implemented
TA0059 # 05 Y:2003 05 2003 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,100 $585 Not Implemented
TA0059 # 06 Y:2003 06 2003 REPAIR FAULTY LOUVERS AND DAMPERS $2,040 $625 Not Implemented
BD0235 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,609 $7,200 Not Implemented
BD0235 # 02 Y:2003 02 2003 INSTALL OCCUPANCY SENSORS $3,778 $5,025 Not Implemented
BD0235 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $2,478 $3,000 Not Implemented
BD0235 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $2,330 $5,700 Not Implemented
BD0235 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $814 $370 Not Implemented
BD0235 # 06 Y:2003 06 2003 USE RADIANT HEATER FOR SPOT HEATING $267 $600 Implemented